District cooling loss waterfall

Every ton-hour of cooling produced should end up on a bill, or have a cause and an owner. This interactive demonstration shows how Inerra Impact accounts for unbilled cooling, from budget to cooling billed and down to the leak, meter or bill behind each loss, using a fictional four-plant district cooling business in the GCC.

At a glance:

Against budget

Metered export against the budget at actual weather, of expected energy. Weather moved the budget by .

How much is explained

How much is actionable

Largest variance and next step

Net budget (P50)

Metered against it

Budget at actual weather

Weather

Metered export

against budget at actual weather

Total losses

Expected energy less metered

Unexplained

Not accounted for by any loss

Data completeness

Weighted by expected energy

From budget to cooling billed

Each loss bar shows the result against the allowance in the budget. Up is better than budget, down is worse. Click a bar to see what is inside it.

The value axis starts above zero so the loss bars stay readable; total bars carry a break mark where they are cut. Source: fictional sample portfolio, full year 2025.

Inside

Allowed ·Actual ·Against allowance

Items and owners

Click an item to see the events or measurements behind it.

Source: fictional sample portfolio, full year 2025.

Who owns the loss

Each loss item mapped to the party that carries it. Some unbilled cooling can be recovered by back-billing, within the limits in each customer contract, so a real assessment records what is recoverable as well as who owns it.

  • Owned by a party or contract
  • No contractual owner
  • Unknown (unexplained)

Source: fictional sample portfolio, full year 2025.

When they happened

Each dot is one event, sized by what it lost. Click a dot or a row to open it.

Events, largest first

Start Site Asset Root cause Duration Lost Status

Times are site local time. Source: fictional sample portfolio, full year 2025.

Losses by month

Every loss category, month by month, with the total the budget allowed marked on each bar. Click a month to set the period, and click it again to go back to the whole period. Click a category in the key to open it.

Source: fictional sample portfolio, full year 2025.

Sites

Sorted by result against budget at cooling produced, worst first. Click a row to drill into the plant. Load factor is cooling produced against plant capacity over every hour in the period.

Site Plant Capacity (TR) Budget at cooling produced (RTh) Billed (RTh) Against budget Losses Unexplained Data completeness Load factor

Source: fictional sample portfolio, full year 2025.

Method, definitions and sample data
Net budget
Cooling the business plan expected to bill in 2025, after the losses it allows for in each category.
Production and connections
The change in budget because the plants produced more or less cooling than planned: hotter or cooler months, buildings connecting earlier or later than the plan assumed, and any network loss or plant meter error above its allowance, which is also shown in its own bar. Cooling produced is what the buildings drew plus what the network lost on the way. It is not an operational loss, so it is shown in grey.
Cooling produced
Cooling leaving the plant, measured at the plant export meter on the network side of the storage tank, so charging and discharging are already netted out. Its flow sensor is on the flow pipe, so a leak from a flow pipe shows in this balance at about 2.3 to 2.8 RTh per m³, while a leak from a return pipe barely does; return leaks cost water and treatment and are followed on the make-up meter, not in these bars.
Cooling billed
Cooling billed to customers and not in dispute, from the energy meters at each building's energy transfer station, estimated bills included. A back-bill the customer disputes stays a loss until it is settled.
Unbilled cooling
The gap between the two, like non-revenue water for a water utility. Some of it is physics: heat gained by buried pipes, and pump work that ends up in the water. The rest is leaks, wet insulation, extra pumping from low delta T, meters reading low, and bills that were estimated, late or wrong.
Allocation
Lost cooling goes to the first cause that applies, in the order the bars run: plant meter error, network faults, network heat gain, low delta T, metering, then billing. Whatever remains is unexplained.
Plant meter error
A plant export meter that reads high makes cooling produced look bigger than it was. It loses no revenue, because customers are billed from their own meters, so it gets its own bar, nothing is allowed for it and it is valued at nothing. It is booked only after a clamp-on check on the export meter has confirmed it, as at Wahat on 14 October 2025; until then the gap stays in unexplained.
Heat gain and pump heat
Ground heat gain depends on pipe size, insulation and ground temperature. It does not scale with cooling load; it follows ground temperature and peaks in late summer. The budget allows the design ground gain in ton-hours for each month, whatever the load, plus pump heat at design as a share of cooling produced. Insulation that has aged past its design heat gain counts with the damaged and wet sections under network faults. About 55% of distribution pump electricity ends up as heat in the water between the plant meter and the building meters. At the design 0.07 kW/TR that is 1.1% of cooling produced, counted with ground gain as design.
Low delta T
Pumping above the design 0.07 kW/TR, and the extra heat a colder return pipe picks up from the ground, both caused by water coming back below its design temperature. The cause is at the building, in the customer's secondary system or the provider's ETS heat exchangers and control valves. The provider carries it unless an approved low delta T surcharge is billed.
Plant view
Electricity per ton-hour of cooling (kW/TR), split into chillers, condenser pumps and cooling towers, distribution pumps and auxiliaries, against the design figures. Low delta T between supply and return raises distribution pumping and keeps more chillers running. Delta T is flow-weighted: cooling divided by water pumped.
Value view
Each RTh at the consumption charge. Metering and billing losses are lost revenue at that charge. Leaks and heat gain are cooling nobody used, so their true cost is the electricity and water to make it; they are shown at the same charge here so the bridge closes. Capacity charges are fixed per ton of contract capacity, so most unbilled cooling does not touch them. The exception is a connected building with no billing account, which misses its capacity charge too. That is not in the value shown here: each of those events notes the capacity charge it missed, about £132.8k in all. A plant meter over-registration is a measurement error with no revenue effect; it is shown at the consumption charge only so the bridge closes. Billing at the wrong rate does not change the ton-hours billed, so it is not in this bridge; a real assessment checks it separately against the tariff schedule.
Back-billing
The contracts allow three months of back-billing before the bill date, for every kind of billing error. Cooling that a back-bill recovered and the customer paid within 2025 is not counted.
Estimates
An estimated bill is a timing difference: the next actual read from the meter's cumulative register bills the rest, so estimates corrected within 2025 are not counted. What stays is what can no longer be billed, where an estimate ran past the three months the contracts allow to back-bill, plus estimates still waiting for an actual read at year end. For a failed meter, the loss is the consumption the contractual estimate did not bill.
Billing status
Open: the error is fixed and the back-bill is still inside the three months, or the actual read is still due. Disputed: the back-bill went out and the customer has not accepted it, so it stays a loss until settled. Closed: written off, beyond the three months or as a concession.
Events
Leaks, meter failures and billing errors are listed one at a time with the building or pipe section, dates, root cause, owner and evidence. A building has one event at a time, and a new building has nothing before its billing account opens. An event that runs past a month end is carried into the next month as its own part, so each month holds the loss it had. Events add up exactly to the item above them.
Response target
4 hours from a leak alarm to a crew on site, and 24 hours from a meter alarm to a technician on site with 72 hours to restore the meter, in this sample. A leak repair often waits for a planned shutdown of the branch, because isolating it cuts off customers. Leaks cost more in make-up water, treatment chemicals and corrosion than in cooling, so each leak event also shows the water lost and what it cost. Small air valve leaks, under about half a cubic metre an hour, cannot be separated from the make-up trend; they are found on the monthly chamber inspection, counted from the inspection before, and carry no response target.
Plant trips
Not a bar here. With the plant meter on the network side of the storage tank, a chiller trip that the storage cannot cover cuts cooling produced and cooling billed alike, so it shows in production and connections, not between the meters.
Data completeness
The share of building meter intervals with a valid reading, weighted by consumption. It falls when meter communications fail or a meter stops.

Sample data. The four plants, their names, tariffs, allowances, events and every number on this page are fictional, generated to show how the waterfall behaves. Meter models are named to make the sample realistic; the faults and figures attached to them are invented. Values are in pounds at the 2025 average rates of about AED 4.84, QAR 4.80 and SAR 4.94 to the pound. The UAE consumption charge of £0.117 per RTh is AED 0.568, the published Empower rate. Qatar and Saudi providers do not publish their tariffs, so £0.100 and £0.090 per RTh are assumptions. Electricity is priced at 2025 DEWA, Kahramaa and SEC commercial rates, with DEWA's fuel surcharge of about 6 fils/kWh. The fuel surcharge that district cooling providers pass on to customers is left out of the consumption charge.